Sewer Camera Inspection
The eleven month recording that settles arguments.
About this serviceDallas-Fort Worth
Fate builds faster than the ground under it settles. Every new house here sits over trenches that were dug, filled with pipe and closed back up in a matter of days, and for the two years afterwards that backfill keeps consolidating. Most of the plumbing complaints in a young subdivision trace back to that.
24/7 dispatch · Fate · Rockwall County
A trench is a column of disturbed soil in undisturbed ground. However well it is compacted, it consolidates over the first couple of seasons, and it does not do it evenly. Three things sit in those trenches: the sewer lateral, the water service, and whatever the utilities put in. All three are affected differently.

The sewer lateral loses its fall in places. A pipe laid at a consistent slope on soft bedding drops a little where the bedding gives way. The result is a belly: a low section that holds water and catches solids. It does not block the day it forms, it blocks the first time something marginal goes down it, usually a year or two later, and then it blocks repeatedly.
Cleanouts and meter boxes sink. They are heavy objects sitting directly on backfill, so they drop faster than the ground around them. A cleanout that has sunk below grade fills with soil, and the cap disappears under grass at exactly the point where someone needs it.
The ground over the trench tells you where it runs. A shallow depression across a new lawn after heavy rain is not a drainage fault. It is the trench line, and it is where water will preferentially soak from now on, which is worth knowing before you plan a patio over it.
The useful moments are the end of the first year and the end of the second. Both are chosen because of warranty terms rather than because of plumbing, but they happen to line up well with how backfill behaves.
At a year, the honest test of a lateral is a camera. It shows standing water in a belly that no amount of rodding will reveal, and it does it before the evidence is a repeated blockage rather than a defect. It is a short job and it either produces a recording you file away or a recording you send to the builder.
At the same visit: lift the cleanout caps and make sure they are above grade and accessible, check the meter box sits level and its lid closes, look at the ground over the service run after rain, and check the pressure at a hose bib. A new subdivision's supply pressure often changes as more of it is built out and the system balances, and a regulator that was fine at handover can be working against a different number a year later.
A belly caused by settlement over an improperly bedded pipe is a workmanship issue, and workmanship is generally covered for the shortest of the warranty periods. That is why the timing matters so much: the same defect found at eleven months and at thirteen months is a very different conversation.
Report in writing, with the camera recording attached, and be specific about distance from the cleanout rather than describing it as a slow drain. Builders respond to a measured defect. They do not respond well to a complaint that reads like a maintenance request, and a slow drain sounds exactly like one.
What is not the builder's: soil grading that you or a landscaper changed, a cleanout buried under new beds, damage from a fence post or a tree planted over the run, and anything that appears after the coverage period with no earlier record. Which is the argument for having the camera run done inside the first year even when nothing is wrong. The recording is the record.
We do a flat rate first-year inspection on new builds: camera the lateral from the cleanout, check grade and access on every cover, gauge the pressure, and hand you a recording plus a plain written summary you can forward to a builder without editing.
Fate, Rockwall, Royse City and Heath are all a short run for us, and if a defect needs a second look after the builder's contractor has been out, that visit is on us.
FAQ
At eleven months, yes. It is the only way to see a belly forming in the lateral while it is still a warranty item rather than a repeat blockage you pay to fix later.
That is the trench line settling, and it is normal. What matters is that it does not channel water toward the house and that you know where it runs before building anything solid over it.
It does the first time you need it at eleven at night. Cleanouts are meant to be visible and above grade, and raising one is a small job compared with locating a buried one during a backup.
Usually the utility for the box itself, the builder if the grading around it is the cause. Either way it should be raised and re-set rather than topped up with soil.
That happens as a subdivision builds out and the system rebalances. Put a gauge on a hose bib to get a number. If it has risen, the regulator and the expansion arrangement need checking; if it has fallen, the cause is usually outside your property.
Very likely, and a camera will say so in minutes. Repeated blockages at a consistent distance from the cleanout are the signature of a belly rather than of anything going down the drain.
In writing, with the recording, the distance from the cleanout, and a plain statement of what the pipe is doing. Avoid the word inconvenient and include a measurement. Documented defects get scheduled; complaints get queued.
Repair rather than argument, unfortunately, and the practical choice is between digging the section and relining it. A camera tells us which is realistic and how much of the run is affected.
Nearby
Services
The eleven month recording that settles arguments.
About this serviceBellies formed where new backfill gave way.
About this serviceRelining a settled section without taking the drive up.
About this serviceRepeat blockages that always sit at the same distance.
About this serviceSupply pressure that changes as a subdivision fills in.
About this serviceService runs moving with the ground above them.
About this serviceTalk to someone now
Camera the lateral while it is still the builder's problem to solve.
Book a two-year check